diff options
author | plampkin <83132062+plampkin@users.noreply.github.com> | 2021-04-27 10:26:54 -0500 |
---|---|---|
committer | GitHub <noreply@github.com> | 2021-04-27 10:26:54 -0500 |
commit | 41926c47faac35dc9cc980a945a221949145e29e (patch) | |
tree | a93084f0803b3402a93aeb2a3cd68f458ba3484e /photoreactor-base | |
parent | d993df1b3630c3a58f50ea9af6876c156406411f (diff) |
Update README.md
fixed wording and spelling.
Diffstat (limited to 'photoreactor-base')
-rw-r--r-- | photoreactor-base/README.md | 6 |
1 files changed, 3 insertions, 3 deletions
diff --git a/photoreactor-base/README.md b/photoreactor-base/README.md index 311cf03..4b69cf4 100644 --- a/photoreactor-base/README.md +++ b/photoreactor-base/README.md @@ -2,10 +2,10 @@ ![WPP base](./base.jpg) -The core structure of the Wisconsin Photoreactor Platform. Each reactor shares this component. It has a 140 mm by 140 mm footprint and is compatible with typical laboratory stir plates. +The core structure of the Wisconsin Photoreactor Platform. Each reactor shares this component. It has a 130 mm by 130 mm footprint and is compatible with typical laboratory stir plates. Through variation of the LED star integrated into a base, the user can control the wavelengths of light delivered by the photon source to a reaction vessel. -See fabrication instructions for LED star installation instructions. See `photon-source-leds` directory for list of LED stars confirmed compatible with the WPP architecture. +Please see [wpp-fabrication-operation.pdf](./fabrication-and-operation-instructions/wpp-fabrication-operation.tex) for fabrication instructions and LED star installation instructions. See `photon-source-leds` directory for list of LED stars confirmed compatible with the WPP architecture. ### Bill of Materials @@ -20,4 +20,4 @@ See fabrication instructions for LED star installation instructions. See `photon | 3/4" screws | Fastenal | 72490 | | All prices are extended estimates in USD. -In general these are overestimates, so this should be an upper-estimate on cost. +In general, these are overestimates, so this should be an upper estimate on cost. |