diff options
Diffstat (limited to 'procedures')
| -rw-r--r-- | procedures/chapter.tex | 630 | 
1 files changed, 583 insertions, 47 deletions
| diff --git a/procedures/chapter.tex b/procedures/chapter.tex index fcac88e..fd04bc3 100644 --- a/procedures/chapter.tex +++ b/procedures/chapter.tex @@ -1,54 +1,81 @@  \chapter{Procedures}  \clearpage -\section{Starting the Millenia V CW LASER.} +\section{``Six-month'' maintenance}  % ------------------------------------------------------------ -The Millennia has problems with ‘thermal runaway’ upon startup if a user naively sends the laser to -4.0 W in power mode (thermal runaway causes the infamous FAULT 146 system shut off, power adjust -timeout error).  % -The following procedure wakes the Millenia up gently enough to prevent thermal runaway.  % -It assumes that the Millenia starts completely shutdown and cold.  % +The laser system that the Wright Group's MR-CMDS instruments use requires regular maintenance.  % +Each component is sensitive to lab conditions such as temperature, humidity, and vibrations.  % +Small deviations in upstream components can cause large problems in downstream optics.  % +Regular maintenance involves ``tune-up'' of upstream components so that upstream lasers function +well and ideally couple into downstream lasers.  % + +Historically, the Wright Group has engaged in reactive maintenance: a ``fix it if it's broken, +don't touch otherwise'' kind of approach.  % +This approach makes a lot of sense for instruments that are quick to fix, and have few active +users.  % + +I instituted a proactive, regular maintenance procedure (described below) that has improved the +predictability of instrumental performance.  % +Predictability is key for instruments with multiple users.  % +Supplies needed:  \begin{denumerate} -  \item Check desiccant inside Millenia, replace if pink. -  \item Ensure that Millenia shutter is closed such that no light is going downstream.  % -  \item Flip orange power switch on diode box. -  \item Wait for system to warm up ($\sim$30 minutes). +  \item 5 gallons distilled water. +  \item Filters.      \begin{denumerate} -      \item ``System Warming Up'' message should appear on control box. -      \item Warm-up is finished when percentage complete indicator reaches 100. -      \item The Millenia will start in SP Current mode. +      \item 2x 5 micron Liquatec SDF-25-0505 +      \item 2x 20 micron general purpose water filter (sold in stockroom)      \end{denumerate} -  \item Record diode hours (choose ``Info'', scroll down). -  \item Turn Millennia to 1.0 W in ``power mode'', wait for equilibration. +  \item Nalco fluids. +    \begin{denumerate} +      \item 4 gallons Nalco 460-PCCL104 (the pink stuff). +      \item 1 gallon Nalco 460-CCL2567 (the clear stuff). +    \end{denumerate} +  \item 150x 5 mg activated charcoal packets (Newport Part \# 90035762)   \end{denumerate} - -Turn Millennia to 1.0 W in “power mode”, wait for it to equilibrate. This entails the diode temperature and current being stable (within 0.1) over 5 minutes. -Turn Millennia to “current mode”. -Slowly ramp current until you have ~4 W (or more) (~70%) -Allow the diode temperature to stabilize while remaining in “current mode” (check every 5 minutes until it doesn't change by more than 0.1) -Turn Millennia to 4.0 W “power mode”. -Wait 10 minutes for extra assurance of equilibration. -Ensure again that temperature and current are not changing (over ~5 minute timescale). -Measure and record actual Millenia output power, currents, temperatures.  -These data should be recorded in the GoogleSheet document for Millennia. +Procedure: +\begin{denumerate} +  \item Turn off all lasers in lab. +  \item In no particular order: +    \begin{ditemize} +      \item Computers in lab. +        \begin{denumerate} +          \item Backup contents. +          \item Uninstall unnecessary software. +          \item Update all necessary software. +          \item Restart. +        \end{denumerate} +      \item Chiller maintenance. +        \begin{ditemize} +          \item See x +          \item See y +          \item See z +        \end{ditemize} +      \item Lab cleaning. +        \begin{denumerate} +          \item Mop the floor, trying to get as much dust as possible. Sweeping in the laser lab is +            discouraged, because it knocks more dust into the air and onto the lasers. +          \item Take out trash. +          \item Empty homeless cables box. +          \item Empty homeless screws box. +          \item Organize any cabling mess. +          \item Remove unused components (optics, electronics, cabling, etc) from laser tables and +            surroundings. Place into appropriate locations. +          \item Organize optics cabinet. +          \item Organize electronics bench. +        \end{denumerate} +    \end{ditemize} +  \item Let lab sit overnight to allow dust to settle and the air to dehumidify. +  \item Start up system again. +    \begin{denumerate} +      \item TODO +    \end{denumerate} +\end{denumerate}  \clearpage -\section{Calibrating the 407A} +\section{Lytron Kodiak RC006}  % ------------------------------------------------------------------ -Calibrating the 407.A - -You may sometimes notice that the zero position changes dramatically from sensitivity to -sensitivity with the 407A. If this happens, iterate through the following until zero stays -consistent: - -Use the fine adjust (knob on side) to zero the 407A on the highest sensitivity - -Use the front adjust (flathead screwdriver needed) to zero on the lowest sensitivity - -\clearpage -\section{Lytron Kodiak RC006  We have one Lytron Kodiak RC006: Model Number RC006G03BB1C002, Serial Number 739383-02.  Regular chiller maintenance: @@ -83,7 +110,7 @@ Ideally the pressure drop across this loop is sufficient to still drive fluid th  % TODO: figure  \clearpage -\section{PolyScience 6000 Series} +\section{PolyScience 6000 Series}  % --------------------------------------------------------------  We own two PolyScience chillers---different models but functionally equivalent. @@ -115,25 +142,534 @@ Regular chiller maintenance:      \end{denumerate}  \end{denumerate} -% TODO: figure -  \clearpage -\section{NesLab Merlin M33} +\section{NesLab Merlin M33}  % ==================================================================== + +We have one NesLab Merlin M33 Chiller, Serial Number 106227049.  % + +This chiller serves four different lasers on the ultrafast system.  % +The cycle goes chiller out $\rightarrow$ Millennia $\rightarrow$ Tsunami $\rightarrow$ Spitfire Ace +$\rightarrow$ Spitfire Pro $\rightarrow$ chiller return. + +Regular chiller maintenance +\begin{denumerate} +  \item Gather supplies. +  \item Drain system completely. +  \item Clean chiller internals. +  \item Disconnect tubing, plug return. +  \item Remove old filter from chiller, discard, replace filter holder. +  \item Drain system completely and flush with several gallons of distilled water (should require +    2), until no suds are formed as new water goes through system. +  \item Fill system with one gallon distilled water, circulate for at least 15 minutes, then drain +    completely. +  \item Place new filter into chiller. +  \item Reconstruct tubing to include lasers in cycle. Ensure that cycle direction is correct. +  \item Fill system with one gallon Nalco 460-PCCL104 (the pink stuff). +  \item Turn chiller on, and allow system to flow for a while to get air bubbles out. +  \item Top off with distilled water until chiller and tubing is full. +\end{denumerate} + +% TODO: figures  \clearpage -\section{Aligining TOPAS-C} +\section{Calibrating the 407A}  % ================================================================= + +Calibrating the 407.A + +You may sometimes notice that the zero position changes dramatically from sensitivity to +sensitivity with the 407A. If this happens, iterate through the following until zero stays +consistent: + +Use the fine adjust (knob on side) to zero the 407A on the highest sensitivity + +Use the front adjust (flathead screwdriver needed) to zero on the lowest sensitivity  \clearpage -\section{Aligning Spitfire PRO} +\section{Millenia}  % ============================================================================= + +\subsection{Startup}  % --------------------------------------------------------------------------- + +The Millennia has problems with ‘thermal runaway’ upon startup if a user naively sends the laser to +4.0 W in power mode (thermal runaway causes the infamous FAULT 146 system shut off: power adjust +timeout error).  % +The following procedure wakes the Millenia up gently enough to prevent thermal runaway.  % +It assumes that the Millenia starts completely shutdown and cold.  % + +\begin{denumerate} +  \item Check desiccant inside Millenia, replace if pink. +  \item Ensure that Millenia shutter is closed such that no light is going downstream.  % +  \item Flip orange power switch on diode box. +  \item Wait for system to warm up ($\sim$30 minutes). +    \begin{denumerate} +      \item ``System Warming Up'' message should appear on control box. +      \item Warm-up is finished when percentage complete indicator reaches 100. +      \item The Millenia will start in SP Current mode. +    \end{denumerate} +  \item Record diode hours (choose ``Info'', scroll down). +  \item Turn Millennia to 1.0 W in ``power mode'', wait for equilibration. +    \begin{ditemize} +      \item Equilibration occurs when diode temperature and current are stable (within 0.1) over 5 +        minutes.  % +    \end{ditemize} +  \item Switch Millennia to ``current mode''.   +  \item Slowly ramp current until you have more than 4 W output (probably $\sim$70\%). +  \item Again, wait for diode temperature and current equilibration. +  \item Switch Millennia to ``power mode'' at 4.0 W. +  \item Ensure one last time that diode temperature and current are not changing over 5 minute +    timescale. +  \item Measure and record actual Millenia output power, currents, temperatures. +\end{denumerate} + +\subsection{Toggling service mode}  % ------------------------------------------------------------- + +On the control board inside the laser, DIP switch \#4 toggles service mode.  % +Service mode unlocks special SP modes.  % +These allow us to record things like Diode hours.  % +Service mode can be buggy, so it's best to leave the Millenia in normal Power mode during regular +operation.  %  \clearpage -\section{Air Handling} +\section{Spitfire Pro}  % ========================================================================= + +Only tune up the Spitfire if you need to, and do not treat it casually---set aside an entire +day.  % +Merely opening the spitfire box exposes the optics to dust.  % +Treating the Spitfire with the respect it deserves will only save time in the long run.  % + +The Spitfire contains 70 charcoal packets.  % +These should be replaced every $\sim$6 months.  % + +\subsection{Startup}  % --------------------------------------------------------------------------- + +Spitfire Pro startup procedure, from cold. + +\begin{denumerate} +  \item Ensure that the software is closed on control laptop. +  \item Turn on Empower power supply (orange switch). +  \item Turn on Timing and Delay Generator ``TDG'' (orange switch). +  \item Turn on temperature control box (orange switch). +  \item Turn key on Empower power supply. +  \item Turn key on TDG. +  \item Start Spitfire software. +    \begin{ditemize} +      \item Often have many faults, most will clear immediately. +      \item Empower LBO temp fault may take a while to clear---normally clears after 5 minutes. +    \end{ditemize} +  \item If Empower has been off (totally, or just at zero amps), warm up at 20 Amps for 1 hour. +    \begin{ditemize} +      \item Use a \textit{good} beam block to block entry into the Cavity during this time.  % TODO: figure +    \end{ditemize}  +\end{denumerate} + +\subsection{Common alignment}  % ------------------------------------------------------------------ + +\subsubsection{Preparation} + +\begin{denumerate} +  \item Check desiccant in temperature control box (blue is good, pink is bad). +  \item Connect the fast oscilliscope so that you can see the pulse train. +  \item If Spitfire is off, go through startup procedure.  % TODO: link to section +  \item If it has not been done in awhile, measure and record an Empower power curve.  % TODO: link +    % to section +  \item Place the 407A after the telescope between the large square mirrors on the empty mount. +    \begin{ditemize} +      \item This mount is dedicated for this purpose, and should be left in the Spitfire at all +        times. +    \end{ditemize} +  \item Set Empower current such that the Empower is delivering $\sim$20 W to the crystal (refer to +    Empower power curve). +\end{denumerate} +\subsubsection{Cavity and pump} + +The first goal in alignment will be to ensure that the cavity and pump are healthy without +seeding (in ns-lasing mode).  % +A well-aligned Spitfire will deliver 5 to 5.2 W to the 407A when pumped with 20 W.  % +The idea of this procedure is to be minimally invasive, while demanding good performance from the +laser.  % +Do not move on to seeded operation until ns-lasing is healthy, but at the same time do not do more +then you need to.  % + +\begin{denumerate} +  \item Switch to ns lasing mode. +    \begin{denumerate} +      \item Block seed at output of stretcher. +        \begin{ditemize} +          \item Note that seed must still enter the stretcher with good enough alignment to defeat +            the bandwidth detector. +        \end{ditemize} +      \item Activate Pockels Cells 2 and 3---do not use Pockels Cell 1. +      \item Expect 20 to 30 ns (2 to 3 round trips) additional build-up time in ns operation. +        \begin{ditemize} +          \item Means you must change timing of Pockels Cell 3 when working in ns lasing mode. +          \item Operate the laser at its ideal switch out time when aligning ns lasing. +          \item Refer to the records to see if your switch-out time is unusual for recent +            performance. +        \end{ditemize} +    \end{denumerate} +  \item Clean all green optics in order of light hitting them. +    \begin{ditemize} +      \item You must get new spectrophotometric grade methanol for this cleaning. +    \end{ditemize} +  \item Loop through the following until ns lasing delivers more than 5 W to the 407A. +    \begin{denumerate} +      \item Check to ensure no optics are damaged, have dust on them etc. +      \item Clean optics. Check power after each cleaning---at the very least you don't want to +        lose power. When cleaning, wait at least a second before letting the light hit the optic +        after cleaning. +      \item Align pump. +        \begin{denumerate} +          \item Decrease the pump power to $\sim$17 A. This should decrease the ns lasing output to +            around 2 Watts, so you should can increase the sensitivity on the 407A if you wish. +          \item Find the ideal switch out (channel 3) time for this lower pump power. It will be +            still later than the aforementioned ns lasing switch out time. Back off the ideal ns +            switch out time by $sim$2 round trips for optimization. +          \item Typically the two mirrors on either side of the cavity (immediate to the lenses) +            are the only pump mirrors touched during alignment. The first pump mirror may be +            touched in special cases but not for regular touch-up. +          \item Block the back reflection with the mirror mount when aligning the second pump +            mirror.  % TODO: figure +          \item Align the back reflection mirror (without beam block). +            \item Iterate through the mirrors until you are satisfied that pump poynting is ideal. +        \end{denumerate} +      \item Align cavity. +        \begin{ditemize} +          \item Never touch anything except the two outermost end mirrors. +          \item Note that the alignment tool is poor to the cavity mode intentionally. +        \end{ditemize} +    \end{denumerate} +\end{denumerate} + +\subsubsection{Seed} + +Now that the cavity is good, you mus couple the seed into it.  % +If you have just aligned the oscillator you should wait at least 10 hours before attempting to +align the seed.  % + +Expect 100 to 150 mW less in seeded mode.  % + +\begin{denumerate} +  \item Remove stretcher cavity flange, being careful not to damage wires. +  \item Align the two apertures either side of the Faraday isolator using mirrors external to +    spitfire. +  \item Align to two ``A'' mask positions in stretcher. +  \item Align to three ``F'' mask positions on the way to cavity (this mirror system is +    under-constrained; consider using the final mirror of the ``A'' mask alignment as a tweaking +    mirror). +  \item Let seed into cavity by turning on channel 1. +  \item Optimize (mirror at D18 and periscope) to putput power before compressor---often useful to +    go one or two round trips less ($\sim$210 ns on channel 3) when aligning seed to power (output +    depends on seed more sensitively and you want to optimize for largest buildup reduction +    time). +  \item Can adjust quarter waveplate to minimize post-pulsing if necessary but be very careful to +    not send the output back into the stretcher. +  \item Ensure pulse is let out of the cavity at the optimal time (check oscilloscope and power). +  \item Remove 407A. +  \item Reconstruct flanges on stretcher cavity. +\end{denumerate} + +\subsubsection{Output} + +Now you must ensure that the cavity output is properly routed through the telescope and compressor +before leaving the Spitfire.  % + +Note that only $\sim$80\% of the cavity output power transmits through the compressor due to +absorbance in the grating and other losses.  % + +\begin{denumerate} +  \item Align to compressor positions (two ``H'') using backwards alignment tool. You will need to +    unplug the compressor stage cable---remember to plug back in. +  \item If the cavity or pump was touched, consider aligning the compressor. +\end{denumerate} + +\subsubsection{Cleanup} + +\begin{denumerate} +  \item Make sure you have taken all of your tools out of the laser. +  \item Make sure you remembered to plug the compressor stage back in. +  \item Wait at least 2 hours before moving on to downstream alignment---best to wait overnight if +    you can. It's OK to make a first pass at rough alignment, but compression and pointing will +    probably change slightly as the laser equilibrates. +\end{denumerate} + +It's normal for the Spitfire output power change by 50 to 100 mW in the first days after +alignment.  % +After that initial change the Spitfire tends to be stable for weeks.  % +During experiments it's a good idea to measure Spitfire output on a daily basis.  % + +\subsection{Stretcher alignment}  % --------------------------------------------------------------- + +This is our current best strategy for stretcher alignment.  % +Use caution and keep your brain in gear when working on this.  % +Since we have not messed with the stretcher frequently this guide cannot be trusted blindly.  % + +\subsubsection{Preparation} + +\begin{denumerate} +  \item Ensure that the Spitfire is off (no pump present in cavity, Pockels cells powered down). +  \item Force upstream oscillator to go CW, adjust output color to be at center of mode-locked +    bandwidth. +  \item Use external mirrors to align through Faraday isolator. +  \item Use first two mirrors after isolator to alignment tool prior to stretcher grating. +\end{denumerate} +   +\subsubsection{Adjustment} + +\begin{denumerate} +  \item Adjust the stretcher grating until the four dots are overlapped. +  \item Use pickoff mirror after stretcher to get the beam to alignment tool. +\end{denumerate} +  +\subsection{Compressor alignment}  % -------------------------------------------------------------- + +\begin{denumerate} +  \item Use the first telescope mirror to align to the alignment tool before the first square +    mirror preceding the compressor. +  \item Use the second telescope mirror to align to the alignment tool when place between the +    square mirrors preceding the compressor. +\end{denumerate} +    \clearpage -\section{Six Month Maintenance} +\section{TOPAS-C}  % ============================================================================== + +% TODO: figure + +\subsection{Common alignment}  % ------------------------------------------------------------------ + +This section discusses common alignment operations that will probably need adjustment on a monthly +basis to ensure ideal OPA behavior.  % +All fs table users should feel comfortable performing these tuneups. + +Tips and tricks: +\begin{ditemize} +  \item As a rule of thumb, if you don't need light through the poweramp the light should be +    blocked to avoid hot spots and damage. The light should be blocked before M8. +  \item Use a fluorescent card to visually get a better idea of the centering of the 800 nm beam +    through the apertures. +  \item Align OPA1 before OPA2. For the sake of consistency, we have agreed that compression should +    be adjusted for OPA1 best performance. OPA2 will have to ``live with'' the compression that is +    best suited for OPA1. +\end{ditemize} + +\subsubsection{Preparation} + +\begin{denumerate} +  \item Ensure that the Spitfire is working (between 3.8 and 4.0 W). +  \item Ensure that the pump is not clipping on any mirrors between Spitfire and OPAs. +  \item Inspect mode structure of pump for hot spots or diffraction. Clean any dust off of mirrors +    between Spitfire and OPAs. +  \item Open OPA lid. +  \item Set OPA to 1300 nm, ensure motors are homed. +\end{denumerate} + +\subsubsection{Preamp} + +\begin{denumerate} +  \item Block pump into poweramp upstream of M8 using block of metal. +  \item Open OPA shutter. +  \item Ensure that the WL plate is not drilled---look for ``sparking''. This takes an experienced +    eye---ask if you have a hard time deciding. If drilled, rotate the WL plate. +  \item Ensure that input poynting and compression are good for the preamp by iterating through the +    following adjustments. Stop iteration once all metrics are good without further adjustment. +    \begin{denumerate} +      \item Iteratively align through A0 and A2. The orange-colored white light should go through +        A2. +      \item Ensure that your poynting changes have not introduced clipping on external mirrors. +      \item Ensure that white light is good. +        \begin{ditemize} +          \item If you are aligning OPA1, adjust compression such that WLG is maximized. Do not +            adjust compression to OPA2 WL. +          \item Adjust $A_{WL}$ until WL is symmetric and stable.  % TODO: figure +          \end{ditemize} +      \item Ensure that no OPG is present in C1. +      \item Manually adjust D1 to maximize seed intensity.   +    \end{denumerate} +  \item Align seed down entire row of holes in-which L6, L7, DM2, NC2, and DM3 lie. Alignment is +    accomplished using M5 and M6. +    \begin{ditemize} +      \item Consider blocking pump into C1 (passing only WL) to ``toggle'' the seed---this helps +        distinguish between orange WL and slightly redder seed. +    \end{ditemize} +\end{denumerate} + +\subsubsection{Poweramp} + +\begin{denumerate} +  \item Unblock pump into poweramp. +  \item Setup 407A power meter outside of OPA. +  \item Adjust manual D2 until over 600 mW is achieved. +  \item Put ``Caution fs OPA free to coldwave'' sign on laser-lab doors. +  \item Remove all optics downstream of Mixer 3: filter periscopes (wavelength selectors), +    periscope, beam splitter, and beam dump. +  \item Iterate the following until optimal power and collinearity are simultaneously reached: +    \begin{denumerate} +      \item Adjust collinearity of three beams using DM2 +        \begin{ditemize} +          \item All beams should be overlapped far away. +          \item Use surveyor's telescope to observe beams. +        \end{ditemize} +      \item Maximize 407A-measured power using manual D2. +      \item Maximize 407A-measured power using M10. +    \end{denumerate} +  \item Reassemble optics downstream of Mixer 3. +  \item Close OPA lid. +  \item Allow a minute for equilibration. +  \item Measure and record power---should be over 600 mW. +\end{denumerate} + +\subsection{Full alignment}  % -------------------------------------------------------------------- + +The following discussion endeavors to be as complete as possible.  % +The goal is to have a procedure the produces a well-aligned OPA regardless of initial +conditions.  % +Experienced OPA users may find only pieces of this guide necessary to solve their particular +problem.  % + +\subsubsection{Preparation} + +\begin{denumerate} +  \item Ensure that the spitfire is working well (between 3.8 and 4.0 W). +  \item Ensure that the pump is not clipping on any mirrors between Spitfire and OPA. +  \item Inspect mode structure of pump for hot spots or diffraction. Clean any dust off of mirrors +    between Spitfire and OPAs. +  \item Open OPA lid. +  \item Set OPA to 1300 nm, ensure motors are homed. +  \item Block pump into poweramp upstream of M8 using block of metal. +  \item Block seed between compensating crystal and M5. +  \item Remove all side walls from OPA. +\end{denumerate} +   +\subsubsection{Input poynting} + +Input poynting is adjusted to ensure good alignment through L1 and L2 into D1. + +\begin{denumerate} +  \item Remove A1/L3, VF, $A_{WL}$. +  \item Place D2 at nominal position (45 degrees). +  \item Using external mirrors, ensure that beam propagates through the alignment tool at the holes +    just after L2 and just before M1 (in D1). +  \item Ensure that you have not introduced clipping external to the OPA. +  \item Ensure that the L1/L2 telescope is outputting a collimated, undistorted beam. +\end{denumerate} +  +\subsubsection{D1 alignment} + +\begin{denumerate} +  \item If you haven't already, remove A1/L3, VF. +  \item Ensure that you are blocking light between compensating crystal and M5. +  \item Remove WLG plate, L4, TD, DM1, knife edge. +  \item Set C1 to surface normal (should be 0 degrees if affix is set correctly in software.) +  \item Using M1 and M2, ensure that beam propagates through the alignment tool at the holes just +    after M2 and just before M5. +\end{denumerate} +  +\subsubsection{White light} + +\begin{denumerate} +  \item Block preamp pump after M3 during this procedure. +  \item Remove WL plate if it is present. +  \item Replace/adjust AL/L3, adjusting focus to be at white light plate desired position. +  \item Replace VF and $A_{WL}$ if they are absent. +  \item Replace the WL plate---ensure that the plate is normal to input beam by visual inspection. +  \item Optimize WLG using VF, $A_{WL}$, and plate position.    +    \begin{denumerate} +      \item Begin with $A_{WL}$ closed. +      \item Open $A_{WL}$ 10\%. +      \item Adjust VF to just allow for onset of WLG. +      \item Adjust position of sapphire plate to maximize visible component of continuum. +      \item Adjust VF to attenuate WLG pump to lowest WLG threshold where central mode and first +        outer rings are visible. +      \item Adjust compression for WLG symmetry. +      \item Continue to open $A_{WL}$ and adjust VS until $A_{WL}$ is as open as possible and VF is +        as dark as possible (while maintaining stable WLG). +    \end{denumerate} +  \item Replace / adjust L4. +    \begin{denumerate} +      \item Remove DM1 if it is present. +      \item Adjust L4 so that the visible component of the WL continuum is focused on A2. This will +        ensure that the NIR component focuses at NC1. +      \item Ensure that the WL remains centered on the alignment tool / A2. +        \begin{ditemize} +          \item L4 may be rotated to adjust height. +        \end{ditemize} +      \item Replace DM1.  +    \end{denumerate}  +\end{denumerate} +  +\subsubsection{Preamp pump} + +\begin{denumerate} +  \item Remove L5, M4. +  \item Adjust M3 to alignment tool holes near edge of OPA to M5 mount. Note that M3 may be rotated +    to change height. +  \item Ensure that beam is passing through alignment tool near M3. If not, consider translating M3 +    or moving BS2. Before making these adjustments ensure that the beam is true into BS2 (see input +    poynting section above). +  \item Replace L5. Ensure that beam through L5 is on-axis with alignment tool in far field. +  \item Replace M4. Point pump so that it intersects with the first red ring in the WL at DM1. +  \item Adjust DM1 to spatially overlap pump with WL in NC1. +  \item Adjust L5 so pump focus in in C1. If OPG in C1 is seen, back-off L5 by moving towards M3 +    until OPG disappears. +\end{denumerate} +  +\subsubsection{Seed} + +\begin{denumerate} +  \item Ensure that both WL and pump are entering C1 properly. +  \item Remove M5 if present. +  \item Manually adjust D1 to optimize seed generation. +  \item Make fine adjustments to M4 and DM1 to ensure that the seed travels along alignment tools +    all the way to the OPA wall. If large adjustments need to be made something upstream must be +    wrong. +  \item Replace M5. +  \item Replace knife edge, if absent. +    \begin{ditemize} +      \item Ensure you are not clipping the red seed profile. +    \end{ditemize} +  \item Remove L6 and L7 if present. +  \item Use M5 and M6 to align the seed to the alignment guide through C2 and out of the OPA. +  \item Replace L6 and L7. +\end{denumerate} +  +\subsubsection{Poweramp} + +\begin{denumerate} +  \item Ensure that pump is not clipping on BS1, M7. +  \item Center pump on M8 using M7. +  \item Remove L8 if present. +  \item Using M8, M9, alignment tool ensure that pump travels along holes from M9 to M10. +  \item Replace L8. +    \begin{ditemize} +      \item Back of L8 Mount to front of M10 should be $\sim$15 cm. +    \end{ditemize} +  \item Without clipping, place M11 and point M10 to minimize off-axis angle at M10 (this requires +    us to put the pump 1/4 inch right of center as viewed while facing M11). +  \item Center pump on M12 using M11. +  \item Center pump on DM2 using M12. +  \item Overlap with seed in NC2 using DM2. +  \item Make small adjustments to M10, DM2 to perfect collinearity and overlap. +  \item Adjust manual D2 until over 600 mW is achived. +  \item Put ``Caution fs OPA free to coldwave'' sign on laser-lab doors. +  \item Remove all optics downstream of Mixer 3: filter periscopes (wavelength selectors), +    periscope, beam splitter, and beam dump. +  \item Iterate the following until optimal power and collinearity are simultaneously reached: +    \begin{denumerate} +      \item Adjust collinearity of three beams using DM2 +        \begin{ditemize} +          \item All beams should be overlapped far away. +          \item Use surveyor's telescope to observe beams. +        \end{ditemize} +      \item Maximize 407A-measured power using manual D2. +      \item Maximize 407A-measured power using M10. +    \end{denumerate} +  \item Reassemble optics downstream of Mixer 3. +  \item Close OPA lid. +  \item Allow a minute for equilibration. +  \item Measure and record power---should be over 600 mW. +\end{denumerate}  \clearpage -\section{Tuning MicroHR Monochromator} +\section{MicroHR Monochromator}  % ================================================================  Visible Grating.  % | 
